Non contractual photo
For one-tube connection with an electronic ballast.
Fitted with 2 sockets with rotor, holding by bracket (B) and 4 meters of wire (2m white/ 2m blue).
A: installation with clips
B: installation with brackets
This kit allows the protection of a third person in the event of disconnection of one of the sockets when the installation is energized.
Complies with IEC 598/EN 60598.
100
9.1 Kgs
116
973 -
200
0 -
120
197 -
200
34
17 -
1
51 -
+999
64
42 No related article on blog