Non contractual photo
For one-tube connection with an electronic ballast.
Fitted with 2 sockets with rotor, holding by bracket (B) and 4 meters of wire (2m white/ 2m blue).
A: installation with clips
B: installation with brackets
This kit allows the protection of a third person in the event of disconnection of one of the sockets when the installation is energized.
Complies with IEC 598/EN 60598.
100
9.1 Kgs
67
19 -
781
1 -
400
21 -
543
26 -
830
17 -
391
64 -
50
0 -
15
0 -
104
No related article on blog