Non contractual photo
For one-tube connection with a ferromagnetic ballast.
Equipped with 2 sockets with rotor, holding by bracket (B), a 4-65w starter and 4 meters of wires (2m white / 2m blue).
A: installation with clips
B: installation with brackets
100
9.1 Kgs
31 -
46
10 -
90
17 -
431
11 -
500
0 -
25
3
86 -
700
5 -
130